23-Jul-2015   |     |   No Comments

Dingo Helps to Construct Bridge on Great Western Trail in Upper Millcreek.

To: Ross Equipment Company

We wanted to pass on the announcement of the construction of another DINGO bridge.  This one is located on the Great Western Trail at over 8000 ft. (2 miles from the trailhead) in the upper Mill Creek Drainage and is 6’ by 16’.  The DINGO

was absolutely critical in the construction of this bridge, we moved all the rock for the ramp approaches and the backfill all had to be moved in from off-site.  The trail work (1000ft) leading to and from the site went through thick tuff that would have been very difficult to remove by hand and the ramps would have been near impossible with wheel barrels.  This project would not have happened if not for the amazing savings in crew time the work that the DINGO accomplished.  I want to thank all the folks at Ross equipment for their continued support of the Salt Lake Ranger District.

From,
Forest Service
Wasatch/Cache National Forest

Salt Lake City Office

 

GWT Mill Creek 7-16-15

GWT Mill Creek 7-15-15

 

GWT Mill Creek 7-16-15

 

 

 

 

 

 

 

 

Source: news


Comments (0)

Leave a comment

Your email address will not be published. Required fields are marked *

©Superior Equipment 2017